home All News open_in_new Full Article

Q2 Metals Intercepts 457.4 metres of 1.65% Li O in Drill Hole 44 at the Cisco Lithium Project

Highlights: CS25-044: Two (2) separate intervals, including 457.4 metres (“m”) at 1.65% Li2O and 36.9 m at 1.65% Li2O. Drill hole CS25-044 is the widest continuous spodumene pegmatite interval drilled by Q2 to date. Infill drilling for incorporation into the initial Mineral Resource Estimate on the Cisco Lithium Project, expected in Q1 2026, will be […]


today 63 h. ago attach_file Other



ID: 2362589887
Add Watch Country

arrow_drop_down